Steppingstone Lane Bridge Restoration

2 March 2002
Finishing the Bridleway Diversion
The February work party left everything ready for the laying of the scalpings for the bridleway diversion. It was decided to hold an extra work party to finish the job. A full turnout ensured a good day's work.

Phil and Richard got to work first on the section of bridleway where it exits the coppice away from the canal and cross a culverted ditch. The scalpings had to be shifted up a short sharp bank and the barrow pusher needed a shove to get him moving.

scalpings1.jpg (62382 bytes)
The scalpings are dumped by Phil to be spread and whacked later

scalpings2.jpg (89519 bytes)
Meanwhile Chris and Orph set to work on the main section of the bridleway.

In the right-hand picture above you can see our retaining timbers wrapped in membrane on either side of the path. The timbers and membrane will make it easier to reclaim and reuse the scalpings when the bridge is complete and the diversion is no longer needed. The bridleway has to be a minimum of 6 feet wide.

Meanwhile Graham ensured there was sufficient headroom for a horse (or was it a giraffe?) and rider and tidied up the site, building a bonfire ready for next work party.

pipe.jpg (82203 bytes)
Alan spent a bit of time trying to make "balloon animals" out of a plastic drainage pipe. His best effort by far was this snake

whacker.jpg (83547 bytes)
Later he did what he does best and whacked the scalpings

By the end of the day the diversion was complete except for the protective railings. These will be completed in no time once we have an effective tool for banging the posts in.

finish1.jpg (71759 bytes)
Alan whacks the final loose scalpings as the day draws to a close

finish2.jpg (70507 bytes)
A view of the completed bridleway from the northern side

finish3.jpg (58168 bytes)
The usual suspects