Steppingstone Lane Bridge Restoration

16 February 2002
Moving the Big Blue Box
In January we finished the preparation of the bridleway diversion, ready for the scalpings to laid down. Before we could start laying the scalpings, we had to move our storage box from its position in a field (where it had been left after the infamous February 2001 work party) to the side of the bridleway diversion.

contents1.jpg (41452 bytes) contents2.jpg (42442 bytes)
The contents of the box removed prior to its move

No lifting equipment was available, only a Tirfor winch. Alan and Graham did the hardwork.

tirfor1.jpg (60314 bytes)
Alan and Graham set up the Tirfor winch

tirfor2.jpg (64483 bytes) tirfor3.jpg (78715 bytes) tirfor4.jpg (76783 bytes) tirfor5.jpg (71227 bytes)
The box is coaxed to its new home

Once the box was in position, scalpings were laid to avoid the entrance to the box getting churned up and to make access easier by removing the step up.

alanwacker1.jpg (67801 bytes) alanwacker2.jpg (67839 bytes)
Alan does what he knows best - whacking

finish1.jpg (69403 bytes) finish2.jpg (76159 bytes)
The job complete, there was time to sit back and relax