By the end of the day everything was ready for the laying of scalpings - as you can see below. Scalpings are only being laid over the dam - the ground in the copse is firm enough without them.

finishsoutha020112.JPG (129826 bytes) finishsouthb020112.JPG (84634 bytes)
The diverted bridleway rejoining the original line on the south side of the copse

finishnorth020112.JPG (224514 bytes)
The northern part of the diversion looking south over the coffer dam

There was one other person on the work party - Alan. Here are some photos of what Alan got up to.

alan1.JPG (81681 bytes) alan2.JPG (81590 bytes)  alan3.JPG (83905 bytes)

Apart from laying scalpings we have to move our blue box from its current location on top of the bank (where it was left after the disaster of February 2001) to the cleared area below - without lifting equipment. But there's nothing that can't be achieved with enough brute force and ignorance.

storagesite.JPG (85933 bytes)